The Zinc Spraying Machine Should Be Selected As Far As Possible Under The Necessary Conditions Of The Production Process Requirements
Apr 14, 2022
The zinc spraying machine uses the electric arc ignited between the two painted metal wires as a heat source to melt the metal wire. We use a high-speed cyclone to atomize the molten metal material or particles, and use it as atomized metal particles. Accelerate; then it is deposited on the surface of the product workpiece and thus produces the coating technology. Below I will introduce in detail what we should pay attention to when applying the zinc spraying machine.
1. Since the zinc spraying machine is a special type of machinery and equipment, it must be carried out by full-time personnel who are responsible for opening and closing and also have application inspections.
2. When designing the lighting equipment of the spray booth, the selected lighting equipment and the main power switch must be explosion-proof to prevent risks when they are turned on.
3. For the dust exhaust fan, the explosion-proof fan must be selected, and the noise of the fan should not exceed the standard.
4. Under the necessary conditions of considering the production process requirements, try to choose a fan that can be used for social and economic development. In addition, the air supply volume of the air supply fan is required to be 10% larger than the air volume of the ventilation system to ensure that the paint room is microscopic. positive pressure
5. When making and installing, it must be done according to the design requirements of the scheme, and avoid changing the construction drawings at will, so as to ensure the installation quality of the paint room.
6. The filtration system of the air supply and exhaust system and the welding fume and oil fume filter should be eliminated on time to avoid damage to the geographical environment during the operation of the system. Try to gradually improve the relevant maintenance management system, and set up full-time personnel to take charge.
7. For the solid waste filtered out of the dry test spray booth and the waste water filtered by the wet paint booth, appropriate emergency treatment must be taken to prevent secondary pollution.